Mining project for the extraction of Hudej - Ples reserves

 

Investor: Termit d. d., Moravče 

Phase: Mining project for the exploitation and implementation of works

Client: Termit d. d., Moravče 

Design of project documentation: 2006 

Project manager: IRGO 

 

Project description

Termit d.d. has the mining right to exploit the flint sand reserves within the mining area defined by Mining Licence No 09-31/4-61 of 17.3.1961. Within this area, reserves were last established in 2003 on a deposit-by-deposit basis. The following have been drawn up and approved for the exploitation of the reserves: the mining method project, the exploitation project and the mining project for the works to be carried out to extract the sand reserves in the Hudej-Ples sand pit, eastern part. However, in order to continue the extraction of the reserves in the Hudej-Ples deposit, a new project for the extraction of sand reserves in the western part of this deposit must also be drawn up, which will be the basis for obtaining all the necessary rights for the extraction of the reserves in this location.

Technical properties

For the excavation of the reserves at the sandpit site, it is necessary to work out all the technical solutions required to ensure that the anticipated daily, monthly and annual excavation rates are achieved in a technically correct and safe manner and in such a way that the environmental impacts are within the permissible norms. In doing so, it is also necessary to take into account the information contained in the existing technical documentation and the current state of the sandpit.


 
MiningPetra Bukovinski