Upgrade of the Railway Section, Maribor - Šentilj – Country Border, Sound Barrier on the Pesnica – Šentilj section – Country Border
Our role: investigation of the horizontal load capacity of the driven steel piles used for the deep foundation of the columns (Horizontal Load Test)
Year of the design of technical documentation: 2019
In the project "REPLACEMENT OF THE MARIBOR - ŠENTILJ - STATE BORDER, ABSORPTION PROTECTION FENCE ON THE PESNICA - ŠENTILJ - STATE BORDER SECTION", we carried out an investigation of the horizontal load-bearing capacity of the driven steel piles used for the deep foundation of the sound barrier columns structure (Horizontal Load Test - HOT).