Stabilisation of the JEZERA Landslide (Pavličevo sedlo)

 

Our role: Supply and testing of permanent prestressed geotechnical anchors and inclinometer measurements.


Stabilisation of the JEZERA landslide on the Logarska dolina-Pavličevo sedlo road with an anchored pile retaining wall and protection of the 16 m deep construction pit with JG piles and temporary IRGO ZPG anchors (231 pcs.).