Protection of the Logatec Wastewater Treatment Plant Construction Pit

 

Investor: Municipality of Logatec 

Phase: detailed design stage

Client: Treven d. o. o. 

Year of the design of technical documentation: 2014 

Project leader: Genera d. o. o.

 

Project description

Protection of the construction pit with a sheet pile wall for the Reconstruction of the Logatec Wastewater Treatment Plant project.

Technical properties

For the construction of pools as part of the reconstruction of the Logatec Wastewater Treatment Plant, a construction pit up to 8 m in depth was vertically excavated and protected by a sheet pile wall. The sheet pile wall was supported with transversely and longitudinally placed compressive ties made of steel profiles.

Participating designers and project organisations

  • Arhitektura MJ d. o. o., Miloš Jeftič, B. Arch.


 
GeotechnicsPetra Bukovinski