Field investigations, laboratory investigations and preparation of a geological-geomechanical study for mod. 1024-BS-L »Bunker building BB2«
Investment value: € cca. 80 mio
Our role: Carrying out the drilling work for the project's investigations in cooperation with the Geology Department
Year of implementation: 2016
- four structural boreholes 30 m deep with structural drilling in Miocene bedrock and pressuremeter measurements.
- two structural boreholes 100 m deep with structural drilling in Miocene bedrock and pressuremeter measurements. Piping of boreholes with PVC pipes for seismic geophysical measurements.