Mining project for the extension of the concession for the usage of technical stone in the mining area of the Črni Kal - Črnotiče quarry
Our role: Mining designer
Year of the design of technical documentation: 2020
A revised mining project has been prepared, which is required by Salonit Anhovo for the purpose of extending the duration of the mining right for the exploitation governed by the concession agreement.
The project deals with the technology of mineral extraction and depositing of material from the excavations for the construction of the second track Divača-Koper.
The mining project specifies and elaborates measures for safe work and measures to minimise the environmental impact, both for the employees and machinery permanently present in the quarry, as well as for the trucks transporting the products or bringing the mineral raw material from the construction site and the machinery used to prepare the imported flysch into the rehabilitation body.